What is the typical MOQ for steel export orders?
MOQ depends on product type. Coil cargo is often planned by full or mixed containers; pipe and plate can start from smaller trial lots when mill windows allow.
Answers on MOQ, lead time, MTC, inspection, Incoterms, customs documents, packing and claims for China steel export buyers.
MOQ depends on product type. Coil cargo is often planned by full or mixed containers; pipe and plate can start from smaller trial lots when mill windows allow.
Typical production windows are 7–21 days after specification lock and deposit. Ocean transit varies by destination; long-haul routes need extra buffer for customs and inland trucking.
Yes. Lot/heat-level MTC with chemical and mechanical data is standard. Extra certificates can be prepared when destination buyers require them.
Yes. SGS, BV, TUV or buyer-nominated inspectors can be scheduled before vessel loading, with photo and report archiving by lot.
FOB, CFR and CIF are commonly supported. We confirm cost split, risk transfer and document set before booking.
Typical packs include commercial invoice, packing list, bill of lading, MTC and certificate of origin. Destination-specific forms should be locked early.
We strengthen moisture protection, edge/coil protection and marking standards for long-haul destinations such as Africa and South America.
Yes. We provide practical equivalent recommendations and highlight differences in chemistry, mechanical properties and acceptance criteria.
Keep lot-level inspection evidence, photos and MTC. Claim handling starts from documented deviation against agreed specs and inspection scope.
Yes. We plan production windows, shipment milestones and document packages by batch to match site installation schedules.